  Removed/installed the Vibration sensor for boiler feed pump, Bangkok Cogeneration Co.,Ltd.
  Re-Wiring the cable for E/I device for Silos, Styrolution(Thailand) Co.,Ltd.
  Installed the power system for New charger room, Styrolution(Thailand) Co.,Ltd. 
  Installed the control system for new 6 meters table machine, Michelin(Thailand)Co., Ltd. 
  Installed E&I system for Pelletizing replacement project, Ineos Styrollution(Thailand)Co.,Ltd.
  Installed the control system for Automatic door machine, Michelin(Thailand)Co.,Ltd. 
  PM & Calibration for field instrument transmitters & Weight scales, Styrolution(Thailand)Co.,Ltd.
  Installed Process analyzer for water treatment plant, Suwannaphum airport power plant 
  Installed the CCTV system at Compounding plant, Ineos Styrolution.
  Pm & Calibration for Pocess analyzer for waste water treatment plant, IPI Indorama.
  Instrument Engineering Design for Ethylene Purified Unit Project, IRPC Co.,Ltd.
  Supplied/Installed the MDB for Maintenance workshop, Ineos Styrolution(Thailand)Co.,Ltd. 
  Instrument/Electrical Engineering Design for spent Caustic Treatment Project, IRPC Co.,Ltd.
  PM & Calibration for Process analyzer, NNEG Power Plant.
  Revamp the instrument air system for Gas booster unit, Suwannaphum airport Power plant.
  Installed the control system for Hot water bath 10 units, Michelin (Thailand)Co.,Ltd.
  Installed the water booster pump system, AISIN Chemical(Thailand)Co.,Ltd.
  Installed Auto VSD control for Dust collector 2 units, AISIN Chemical(Thailand)Co.,Ltd.

 